Apply For Nigeria LNG Under-Graduate And Post-Graduate Scholarship Scheme 2017
Nigeria LNG Limited was incorporated as a limited liability company on 17 May 1989, to produce LNG and natural gas liquids (NGL) for export. The plant was built by TSKJ consortium, which was led by former Halliburton’s subsidiary KBR. Other participants of the consortium were Snamprogetti, Technip and JGC Corporation. The first train came into operation in 1999.
In September 1999, the Bonny plant started production and was expected to send its first shipment in October. It started with sales contracts with Enel for 3.5 billion bcm/y, Enagás for 1.6 bcm/y, BOTAŞ for 1.2 bcm/y, and Gaz de France for 500 million cu m/year. The feed gas was provided by Shell, Elf Aquitaine and Agip.Apply For Nigeria LNG Under-Graduate And Post-Graduate Scholarship Scheme 2017
Application Deadline: 30th April, 2017ckick here to apply
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home